Road estimates with complete Rate Analysis — in hours, not days.
Rapid BOQ prepares the Detailed Estimate of a road the way an experienced estimator does: measurements with deductions and widening, sources and leads of every material, item rates analysed exactly as the Schedule of Rates prescribes, the Abstract of Cost with taxes and cess, and the Schedule of Quantities for tender — printed in the government A4 format.
Everything a road estimate needs
Bituminous works, WBM and GSB, earthwork, culverts, drains and road furniture are picked from the searchable SoR library by chapter or by words in the description. Each item carries its analysis, so the rate is never typed by hand.
- Measurements: Nos × L × B × H with arithmetic, deductions and widening
- Road stretches with chainages
- Materials at site: stack yards, quarries, refineries and depots with surfaced / unsurfaced / katcha leads
- Current bitumen prices and carriage slabs applied to every item that uses them
- Abstract of Cost with CGST, SGST, Labour Welfare Cess and contingency, rounded and in words
Three Schedules of Rates in one workspace
PWD WB NH SoR 2019-20 (778 items) for national-highway and PWD road and bridge works, WBSRDA SoR 2019 (378 items) for PMGSY and rural roads, and CPWD DSR 2023 with the Delhi Analysis of Rates and correction slips (3,150 items) adjusted by the CPWD Cost Index.
Printed the way your office files it
Cover, Detailed Estimate, Abstract, Analysis of Rates and Material Rates come out as one paginated A4 PDF in Times New Roman with C/O – B/F, Indian digit grouping and signature blocks chosen by the amount of the estimate — each with the officer’s name, designation and short office name.
Questions
Can Rapid BOQ prepare PMGSY road estimates?
Yes. Choose WBSRDA SoR 2019 for the work: the rates already include overheads, profit and cess as the Schedule states, and GST is added on the estimated cost.
Are leads and carriage calculated automatically?
Yes. Set the source and lead of each material once; carriage is worked out from the Schedule’s own slabs on every item that uses the material.
Can I try it before paying?
Yes — the 14-day free trial includes 2 projects and every feature; PDFs of the trial carry a watermark.
Also see
Prepare your next estimate free for 14 days.
2 projects · every feature · no payment to start. Your work carries over when you subscribe.