PWD West Bengal (NH) SoR 2019-20 — every rate analysed as the Schedule does.
All 778 items of the PWD WB National Highway Schedule of Rates 2019-20 (Road & Bridge Works) are in Rapid BOQ with their analysis: labour and machinery, Chapter-A materials, carriage, overheads, contractor’s profit and cess. The sample NH estimate reproduces every published rate.
Rate Analysis you can show and defend
Open any item and see its analysis line by line — the same structure the SoR uses. Where a site condition needs a change, edit the line and record the justification; the printed Analysis of Rates shows it.
Materials, leads and current prices
Stone chips, sand, bitumen, cement and steel are taken from the sources you choose, with surfaced, unsurfaced and katcha leads. Bitumen prices can be updated to the current ones; hill and island additions are applied where they belong.
From estimate to tender and bills
The same estimate gives the Schedule of Quantities, the e-Tender Percentage and Item-Rate BoQ, and later the contractor’s bills — Form 24 for a First & Final Bill and P.W. Accounts Form 27 for Running Account Bills.
Corrigenda and addenda, from their date of effect
The 1st Addenda & Corrigenda (01.11.2019) and the 2nd Addenda of 86 new Chapter-17 items (01.02.2020) are built in, and later official corrigenda are installed automatically. Each applies from its own date of effect: an estimate dated earlier follows the Schedule as it stood then, and a finalized estimate keeps the rates it was finalized with.
Questions
Are the corrigenda and addenda included?
Yes. The 1st Addenda & Corrigenda (01.11.2019) and the 2nd Addenda (01.02.2020) are built in, and later official corrigenda are installed automatically — each from its date of effect, without changing finalized estimates.
Does the analysis match the published SoR rates?
Yes — the analysis follows the Schedule’s own methodology, and the NH sample estimate reproduces the published rates exactly.
Can I add items that are not in the SoR?
Yes. Out-of-SoR items can be analysed with their own lines; overheads, profit and taxes set for the estimate apply to them.
Prepare your next estimate free for 14 days.
2 projects · every feature · no payment to start. Your work carries over when you subscribe.