CPWD DSR 2023

CPWD DSR 2023 with the Delhi Analysis of Rates and the Cost Index.

For buildings and other works estimated on the CPWD Delhi Schedule of Rates 2023, Rapid BOQ carries 3,150 items with the Delhi Analysis of Rates and the correction slips, and applies the CPWD Cost Index for the place of work.

Cost Index and correction slips

The Cost Index is applied in the abstract as the guidelines require, and items changed by correction slips use the corrected description and rate.

One format for every Schedule

A CPWD estimate prints in the same paginated A4 format as your road estimates — Detailed Estimate, Abstract of Cost, Analysis of Rates — with signature blocks by the amount of the estimate.

Questions

Which CPWD Schedule is included?

CPWD DSR 2023 with the Delhi Analysis of Rates and its correction slips.

Is the Cost Index applied automatically?

Yes — choose the Cost Index for the place of work and the abstract applies it.

Prepare your next estimate free for 14 days.

2 projects · every feature · no payment to start. Your work carries over when you subscribe.